Belton Custom Cabinets logoBelton Custom CabinetsBelton, TX
Custom Kitchen Remodels photo

Belton Custom Cabinets

Custom Kitchen Remodels in Belton, TX

Full kitchen remodels built around custom cabinetry. Layout changes, new boxes, free estimates on every job.

  • 15+ Years local experience
  • 500+ Projects completed
  • Licensed & Insured

Serving Belton and nearby communities.

A kitchen remodel is more than new doors on old boxes. It means rethinking the layout, moving cabinets where they actually work, and building storage around how your family cooks. Belton Custom Cabinets handles the cabinetry side of a full remodel start to finish, coordinating with your countertop and appliance choices along the way.

Most remodels we run start with a kitchen that no longer fits the house. Maybe the layout is closed off. Maybe storage never kept up with the family. Maybe the cabinets are original to the build and just worn out. We design and build new cabinetry to the actual room, not a stock plan pulled off a shelf.

What's included

What's Included with Custom Kitchen Remodels

Typically included: full cabinet design, new boxes and doors, hardware, install coordination with countertop and appliance installers. Optional: lighting cutouts, pantry cabinet additions, island reconfiguration. Customer prep: clear out the kitchen and confirm any appliance models ahead of the design meeting.

How it works

How Our Custom Kitchen Remodels Process Works

  1. Initial Design Consultation photo
    Step 1

    Initial Design Consultation

    We review your goals and existing kitchen layout to plan the remodel.

  2. Space Planning photo
    Step 2

    Space Planning

    A revised floor plan maps better traffic flow and storage.

  3. Demolition And Prep photo
    Step 3

    Demolition And Prep

    Old cabinetry comes out and the room gets prepped for new boxes.

  4. Cabinetry Installation photo
    Step 4

    Cabinetry Installation

    New custom cabinets go in to the approved design.

  5. Countertop Integration photo
    Step 5

    Countertop Integration

    Countertops get fitted and aligned to the new cabinet runs.

  6. Final Walkthrough photo
    Step 6

    Final Walkthrough

    We walk the finished kitchen with you before calling it done.

Materials

Materials and Methods for Custom Kitchen Remodels

A remodel needs to outlast the next decade of daily use, not just look good on install day.

  • Engineered Wood Panels photo

    Engineered Wood Panels

    Stable boxes that won't warp through Belton's humidity swings between summer and winter.

  • Custom Cabinet Doors photo

    Custom Cabinet Doors

    Built to the new layout, not a catalog size that leaves gaps.

  • Integrated Appliance Panels photo

    Integrated Appliance Panels

    Panels that hide the fridge or dishwasher front for a built-in look.

  • Under-Cabinet Lighting photo

    Under-Cabinet Lighting

    Wired in during the remodel so there's no retrofit later.

  • Hardware Finishes photo

    Hardware Finishes

    One coordinated hardware set across the whole kitchen.

  • Sealant Coatings photo

    Sealant Coatings

    Protective topcoats that handle grease and steam without yellowing.

Timeline

How Long Does a Custom Kitchen Remodels Project Take?

A full remodel runs longer than a straight cabinet swap because the layout itself is changing.

  1. 01

    Design consult

    same week

  2. 02

    Final design approval

    1–2 weeks
  3. 03

    Build

    5–7 weeks
  4. 04

    Demo and install

    1–2 weeks

Need a schedule that fits?

Get a Free Estimate

Before & after

Before and After Custom Kitchen Remodels

  • Custom Kitchen Remodels photo
    Before
  • Custom Kitchen Remodels photo
    After

FAQs

Custom Kitchen Remodels FAQs

What's the difference between refacing and a full remodel?

Refacing keeps your existing cabinet boxes and swaps doors and finish. A full remodel changes the layout and replaces the boxes themselves, which is the right call when storage or flow is the real problem.

How much should I budget for a full kitchen remodel versus new doors only?

New doors alone usually run a few thousand dollars. A full cabinet remodel with layout changes typically runs well into five figures, depending on kitchen size and material grade. We give you a written number after the design consult.

Do I need to move out during the remodel?

Not usually. Expect limited kitchen access during demo and install, usually a week or two of that stretch.

Can you keep my existing countertop?

Sometimes, if the layout doesn't change dimensions. We'll tell you straight during the consult if it'll work.

How far ahead should I book a remodel?

Plan on 6-8 weeks from first call to finished kitchen, longer if you're also waiting on countertop fabrication.

Next step

Get a Custom Kitchen Remodels Estimate in Belton

Call (254) 613-8125 or request a free estimate and we'll set up a design consult for your kitchen.

Ask about Custom Kitchen Remodels

Tell us about the project and how to reach you.

Call (254) 613-8125